C.V.G. Ferrominera
Puerto Ordaz,Venz.
NORAMCO provided detail engineering design services for the reliability upgrade of the annular cooler for the FMO pellet plant including development of a new design for an air cooled screed wall with contoured bottom to assist with pellet cooling efficiency, installation of water seals in lieu of sand seals and replacement of the moving walls with prefabricated refractory lined wall sections.
Back

- Enlarge Next »
Cliffs Natural Resources, Northshore Mining
Rotary Car Dump Structural Analysis
NORAMCO Engineering was retained to perform a physical condition re...More »
Magnetation Inc.
NORAMCO Engineering was retained by Magnetation Inc. to provide Pro...More »
Mechanical Engineer
NORAMCO Engineering Corporation (NEC), is accepting CV/Resumes for ...More »
2010 CIM Conference and Exhibition
Visit us in Vancouver, BC at the CIM (Canadian Institute of Mining)...More »
Mesabi Nugget Update
Mesabi Nugget continues to ramp up production at the plant in Hoyt ...More »